4D, 5D & 6D BIM Services
Smart Project Planning, Budgeting & Facility Management
We bring precision to construction sequencing, budget control, and long-term asset management using data-rich BIM workflows.
What Is 4D, 5D & 6D BIM?
4D BIM enhances traditional 3D models by incorporating time-related data, enabling construction sequencing, schedule visualization, and progress tracking to improve planning, coordination, and project delivery timelines.
5D BIM links cost data to the model, allowing accurate quantity take-offs, real-time budgeting, and cost estimation throughout the project lifecycle for improved financial management and decision-making.
6D BIM integrates facility management and operational data into the model, supporting asset maintenance, energy analysis, and lifecycle planning to optimize post-construction performance and sustainability.
BIM Level | Key Deliverables | Tools/Tech Used | Client Value |
---|---|---|---|
4D BIM |
|
|
|
5D BIM |
|
|
|
6D BIM |
|
|
|
Why Patternive 360 for 4D–6D BIM?
Feature | Our Advantage |
---|---|
Integrated Planning | Time, cost, and asset data combined into one model |
Team Expertise | Specialized 4D/5D planners & FM modelers |
Flexible Tools | Works with Revit, Navisworks, Excel, COBie |
Fast Turnaround | Milestone-based phased delivery |
Global Time Zone Coverage | Asia + EU + US shift teams |
Cost-effective | Save up to 60% vs. in-house ops |
What We Do in 4D–6D BIM
- Link model elements to project timeline (4D BIM)
- Integrate BOQs and cost data (5D BIM)
- Simulate construction sequencing and logistics
- Generate budget reports and procurement packages
- Add facility tags and FM metadata (6D BIM)
- Create COBie/IFC-compliant outputs for asset management
Benefits of Using 4D–6D BIM
Category | Benefit |
---|---|
Time | Optimized schedules, fewer delays, logistics clarity |
Cost | Budget tracking, faster tenders, fewer overruns |
Operations | Post-handover FM-ready BIM |
Collaboration | Centralized model for all stakeholders |
Risk | Fewer surprises on-site, data-driven decisions |
Proven Results: BIM That Delivers Measurable Impact
Our integrated 4D, 5D, and 6D BIM workflows drive efficiency, accuracy, and cost control—backed by real data. Here’s how our clients benefit from smarter construction and facility management.
30%
Faster project completion using 4D planning integration.
25%
Up to 25% cost savings with 5D BIM workflows.
35%
Reduction in site rework via accurate coordination.
10+
RFIs avoided per project through clash-free modeling.
60%
Less time in handover using 6D data models.
50%
More accurate cost forecasts with real-time model links.
Tools & Platforms We Use
- Modeling & Coordination: Revit, Navisworks
- Scheduling: Primavera P6, MS Project
- Cost Estimation: CostX, Excel BOQ, BIM 5D Plugins
- Facility Management: COBie, Planon, Maximo
- Data Standards: IFC, ISO 19650, OmniClass
Project-Level Impact of 4D–6D BIM
- Improved coordination between planning, cost control, and site teams
- Data-rich insights reduce guesswork and site inefficiencies
- Enables construction tracking with model-linked Gantt charts
- Helps meet regulatory, energy, and FM compliance goals
- Supports decision-making during value engineering and rework phases
Importance in Real-World Construction Workflows
Without 4D–6D BIM, teams rely on disconnected schedules, BOQs, and post-it notes. These models unify everything—time, cost, and usage—into a single source of truth that evolves across the project lifecycle. It’s not just a digital tool; it’s the nerve center of modern construction execution and asset use.
Phase-by-Phase Workflow
- Gather drawings, BIM files, cost data, and project schedule
- Define deliverables, tools, and communication channels
- Sign NDA & onboarding documentation
- Associate BIM elements with construction timelines (4D)
- Map model data with BOQ/cost items (5D)
- Prepare base files for FM metadata (6D)
- Generate visual construction sequences
- Create cost dashboards and procurement visualizations
- Apply COBie/FM logic for lifecycle insights
- Share progress files for client feedback
- Run multiple iterations with coordination teams
- Adjust based on time/cost inputs
- Submit 4D animation, 5D reports, 6D FM outputs
- Provide formats: DWG, IFC, Excel, PDF, MP4
- Handover documentation + ongoing support (if required)
Need help?
In this section, you can address common questions efficiently.
How is 4D BIM scheduling managed accurately?
We link each model element to timelines for exact site planning and progress tracking.
What if cost data changes mid-project?
Our models are dynamic—cost updates reflect in reports, BOQs, and dashboards instantly.
Can you integrate with my procurement platform?
Yes, we adapt our 5D data to sync with external procurement or ERP systems.
Is 6D BIM suitable for all buildings?
Yes, especially helpful for hospitals, campuses, hotels, and buildings with long lifecycles. |
What do I need to get started?
Just your current BIM or CAD models and basic schedule—we’ll handle the integration.
How detailed is your FM-ready model output?
We tag every asset, system, and room with maintenance metadata aligned to COBie and IFC standards.
Discover our solutions
Write one or two paragraphs describing your product, services or a specific feature.
To be successful your content needs to be useful to your readers.
Let's Connect
Get in touch with your customers to provide them with better service. You can modify the form fields to gather more precise information.