4D, 5D & 6D BIM Services 

Smart Project Planning, Budgeting & Facility Management

We bring precision to construction sequencing, budget control, and long-term asset management using data-rich BIM workflows.

Discover

 

What Is 4D, 5D & 6D BIM?

4D BIM

4D BIM enhances traditional 3D models by incorporating time-related data, enabling construction sequencing, schedule visualization, and progress tracking to improve planning, coordination, and project delivery timelines.

5D BIM

5D BIM links cost data to the model, allowing accurate quantity take-offs, real-time budgeting, and cost estimation throughout the project lifecycle for improved financial management and decision-making.

6D BIM

6D BIM integrates facility management and operational data into the model, supporting asset maintenance, energy analysis, and lifecycle planning to optimize post-construction performance and sustainability.

BIM LevelKey DeliverablesTools/Tech UsedClient Value
4D BIM
  • Integration of 3D model with construction schedule (Primavera P6, MS Project)
  • Construction sequencing animations (MP4s or embedded viewers)
  • Site logistics simulation (crane paths, material zones, worker movement)
  • Timeline clash detection (e.g., simultaneous resource conflicts)
  • Autodesk Navisworks Timeliner
  • Synchro 4D
  • Revit + Phasing
  • BCF for coordination
  • Improved planning accuracy
  • Visual communication with contractors & clients
  • Reduced delays & rework
  • Safer, more efficient site execution
5D BIM
  • Automated quantity takeoffs (QTOs) linked to model elements
  • Dynamic Bill of Quantities (BOQs) updated with design changes
  • Budget simulations across milestones and packages
  • Real-time change impact tracking on cost
  • CostX
  • Revit (schedules + tags)
  • Excel integrations
  • Dynamo scripts for automation
  • Reduced manual estimation effort
  • Better procurement planning
  • Faster cost analysis in design iterations
  • Aligned cost & scope control
6D BIM
  • Asset tagging for FM (e.g., equipment IDs, warranty, serial numbers)
  • COBie/IFC-compliant datasets
  • Integration-ready data for FM platforms (Maximo, Archibus, Planon)
  • Operational dashboards (Excel/Power BI) with maintainable asset logs
  • Lifecycle planning modules for predictive maintenance
  • COBie templates
  • BIM 360 Ops
  • IBM Maximo, Archibus
  • Excel + Revit + IFC tools
  • Reduced O&M costs
  • Better handover documentation
  • Readiness for Digital Twin / IoT integration
  • Easier transition from build to operate


Why Patternive 360 for 4D–6D BIM?

FeatureOur Advantage
Integrated PlanningTime, cost, and asset data combined into one model
Team ExpertiseSpecialized 4D/5D planners & FM modelers
Flexible ToolsWorks with Revit, Navisworks, Excel, COBie
Fast TurnaroundMilestone-based phased delivery
Global Time Zone CoverageAsia + EU + US shift teams
Cost-effectiveSave up to 60% vs. in-house ops

What We Do in 4D–6D BIM


  • Link model elements to project timeline (4D BIM)
  • Integrate BOQs and cost data (5D BIM)
  • Simulate construction sequencing and logistics
  • Generate budget reports and procurement packages
  • Add facility tags and FM metadata (6D BIM)
  • Create COBie/IFC-compliant outputs for asset management

Benefits of Using 4D–6D BIM

CategoryBenefit
TimeOptimized schedules, fewer delays, logistics clarity
CostBudget tracking, faster tenders, fewer overruns
OperationsPost-handover FM-ready BIM
CollaborationCentralized model for all stakeholders
RiskFewer surprises on-site, data-driven decisions


Proven Results: BIM That Delivers Measurable Impact


Our integrated 4D, 5D, and 6D BIM workflows drive efficiency, accuracy, and cost control—backed by real data. Here’s how our clients benefit from smarter construction and facility management.

30%

Faster project completion using 4D planning integration.


25%
Up to 25% cost savings with 5D BIM workflows.


35%
Reduction in site rework via accurate coordination.


10+

RFIs avoided per project through clash-free modeling.


60%
Less time in handover using 6D data models.


  50% ​
More accurate cost forecasts with real-time model links.


Tools & Platforms We Use


  • Modeling & Coordination: Revit, Navisworks
  • Scheduling: Primavera P6, MS Project
  • Cost Estimation: CostX, Excel BOQ, BIM 5D Plugins
  • Facility Management: COBie, Planon, Maximo
  • Data Standards: IFC, ISO 19650, OmniClass

Project-Level Impact of 4D–6D BIM


  • Improved coordination between planning, cost control, and site teams
  • Data-rich insights reduce guesswork and site inefficiencies
  • Enables construction tracking with model-linked Gantt charts
  • Helps meet regulatory, energy, and FM compliance goals
  • Supports decision-making during value engineering and rework phases

Importance in Real-World Construction Workflows

Without 4D–6D BIM, teams rely on disconnected schedules, BOQs, and post-it notes. These models unify everything—time, cost, and usage—into a single source of truth that evolves across the project lifecycle. It’s not just a digital tool; it’s the nerve center of modern construction execution and asset use.

Learn more

Phase-by-Phase Workflow

 Project Briefing & Kickoff
  • Gather drawings, BIM files, cost data, and project schedule
  • Define deliverables, tools, and communication channels
  • Sign NDA & onboarding documentation
 ​Model Linking & Setup
  • Associate BIM elements with construction timelines (4D)
  • Map model data with BOQ/cost items (5D)
  • Prepare base files for FM metadata (6D)
Simulation & Analysis

  • Generate visual construction sequences
  • Create cost dashboards and procurement visualizations
  • Apply COBie/FM logic for lifecycle insights
Review & Revisions
  • Share progress files for client feedback
  • Run multiple iterations with coordination teams
  • Adjust based on time/cost inputs
Final Delivery

  • Submit 4D animation, 5D reports, 6D FM outputs
  • Provide formats: DWG, IFC, Excel, PDF, MP4
  • Handover documentation + ongoing support (if required)
 

Need help?

In this section, you can address common questions efficiently.

How is 4D BIM scheduling managed accurately? ​

We link each model element to timelines for exact site planning and progress tracking.

What if cost data changes mid-project?

Our models are dynamic—cost updates reflect in reports, BOQs, and dashboards instantly.

Can you integrate with my procurement platform?

Yes, we adapt our 5D data to sync with external procurement or ERP systems.

Is 6D BIM suitable for all buildings?
Yes, especially helpful for hospitals, campuses, hotels, and buildings with long lifecycles.

What do I need to get started? ​

Just your current BIM or CAD models and basic schedule—we’ll handle the integration.

How detailed is your FM-ready model output? ​

We tag every asset, system, and room with maintenance metadata aligned to COBie and IFC standards.

  What do you want to promote ?     See more

Discover our solutions

Write one or two paragraphs describing your product, services or a specific feature.
To be successful your content needs to be useful to your readers.

Our store Contact us

Let's Connect

Get in touch with your customers to provide them with better service. You can modify the form fields to gather more precise information.